Skip to content
Cradley Heath 01384 412745 Local Delivery Available Trade Accounts
Mon–Fri 7:30am–5:00pm | Sat 8:00am–12:00pm

How to Prepare a Base for a Patio

Landscaping advice

How to Prepare a Base for a Patio

The paving is only the top layer. A durable patio needs suitable ground preparation, drainage, a compacted sub-base and a laying system that matches the paving product.

Cutaway illustration showing paving above a laying bed, compacted sub-base and ground.
Heritage practical guide illustration.

Quick sub-base estimate

Planning estimate only. Check the product specification and site conditions before ordering.

Set levels and drainage first

Plan where surface water will go and keep finished paving at a suitable level relative to the building and damp-proof course. Product and site requirements can vary.

Prepare and compact the sub-base

Remove unsuitable soft material and compact the sub-base in appropriate layers. For many domestic patio systems, manufacturer guidance commonly shows Type 1 quality material as the sub-base, but depth should suit the ground and loading.

Use the paving manufacturer’s laying system

Natural stone, concrete and porcelain products can have different bedding, priming and jointing requirements. Follow the product instructions rather than applying one generic method to every slab.

Shop the job

Find the materials at Heritage

UK standards & regulatory guidance

Check the latest requirements that apply to your particular property and project.

  • Planning Portal – Patio and driveway
Call Shop Quote